Publications

Working

  • Application of 3D Game Engine for Condominium Developers
  • Risk Analysis Application for Construction Projects in Microsoft Project
  • Risk Analysis and Simulation in Feasibility Study for Condominium Projects

 

Published

  • Srisuwanrat, C. and Rerkudonsin, P. (2017). “A Case Study of Practical Planning a Housing Project using Repetitive Scheduling Method” NCCE ’17 The 22nd National Convention on Civil Engineering, Thailand
  • Srisuwanrat, C. and Pluengcharoenpol, P. (2017). “Comparison of Resource Allocation Techniques: PACK Method, Minimum Moment Method, and Exhaustive Search” NCCE ’17 The 22nd National Convention on Civil Engineering, Thailand
  • Srisuwanrat, C. and Mongkolla, T. (2015). “Unity 3D Game Engine Presenting Interactive and Real-time Rendering Virtual Reality for Construction” NECC ’16 The 2nd National Engineering and Construction Conference, Presented poster, Thailand
  • Srisuwanrat, C. and Rerkudonsin, P. (2015). “Scheduling Housing Project using Repetitive Scheuduling Method (RSM) and Alternatives” NECC ’16 The 2nd National Engineering and Construction Conference, Presented poster and discussion, Thailand
  • Srisuwanrat, C. (2009). “The Sequence Step Algorithm: A Simulation-Based Scheduling Algorithm for Repetitive Projects with Probabilistic Activity Durations” Ph.D. Dissertation, University of Michigan, Ann Arbor, MI, USA
  • Srisuwanrat, C., Ioannou, P.G. and Tsimhoni, O. (2008). “Simulation and optimization for construction repetitive projects using Promodel and Simrunner” WSC ’08 Proceedings of the 40th conference on Winter Simulation, FL., USA
  • Srisuwanrat, C. and Ioannou, P.G (2007). “Optimal scheduling of probabilistic repetitive projects using completed unit and genetic algorithms” WSC ’07 Proceedings of the 39th conference on Winter Simulation, D.C., USA
  • Srisuwanrat C. and Ioannou, P.G. (2007). “Investigation of Lead-Time Buffering Under Uncertainty Using Simulation and Cost Optimization” In Proc. 15th Annual Conf. of Intl Group for Lean Construction (IGLC 15), MI, USA.
  • Ioannou, P.G and Srisuwanrat, C. (2007). “Optimal work breaks in deterministic and probabilistic repetitive projects” WSC ’07 Proceedings of the 39th conference on Winter simulation, D.C., USA
  • Ioannou, P.G. and Srisuwanrat C. (2007). “Probabilistic Scheduling For Repetitive Projects” In Proc. 15th Annual Conf. of Intl Group for Lean Construction (IGLC 15), MI, USA.
  • Ioannou, P.G and Srisuwanrat, C. (2006). “Sequence step algorithm for continuous resource utilization in probabilistic repetitive projects” WSC ’06 Proceedings of the 38th conference on Winter Simulation, CA, USA
  • Srisuwanrat, C. (2006). “Resource-Driven Simulation for Drill and Blast Tunneling Method” University of Michigan, Ann Arbor, MI, USA
  • Srisuwanrat, C. (2005). “Advanced Application of 3D Laser Scanner in Project Progress Measurement” University of Michigan, Ann Arbor, MI, USA
  • Srisuwanrat, C. (2004). “New Modified Minimum Moment Method in Resource Leveling and Application” University of Michigan, Ann Arbor, MI, USA
Advertisements